Project Name Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam-Devarapalle) of length 33.604 km from Thallampadu village to Somavaram village (Design Chainage 0+000 to 33+604) under Inter Corridor Route under Bharatmala Pariyojana, on Hybrid Annuity mode in the state of Telangana (Package-I)
Total Bid Project Cost: 772.11 Cr. (Incl GST)
Project Total Length: 33.604 Kms
Pavement Type: Flexible
No of Lanes: 4
Right of Way: 60 Meter
Date of LOA: 15th September 2021
Date of Agreement: 28th August 2022
Date of Appointment: 31st October 2022
Date of Completion: 29th October 2024
Completion Period: 24 months from date of Appointment
Client: National Highways Authority of India (NHAI)
Concessionaire: H.G. Khammam Devarapalle Pkg-1 Private Limited
EPC Contractor: H.G.INFRA ENGINEERING LTD.
Independent Engineer: LEA Associates South Asia Pvt. Ltd
Project Model Type: Hybrid Annuity Mode (HAM)
Maintenance Period: 15 Years
Project Features
Project Name Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam-Devarapalle) of length 33.604 km from Thallampadu village to Somavaram village (Design Chainage 0+000 to 33+604) under Inter Corridor Route under Bharatmala Pariyojana, on Hybrid Annuity mode in the state of Telangana (Package-I)
Total Bid Project Cost: 772.11 Cr. (Incl GST)
Project Total Length: 33.604 Kms
Pavement Type: Flexible
No of Lanes: 4
Right of Way: 60 Meter
Date of LOA: 15th September 2021
Date of Agreement: 28th August 2022
Date of Appointment: 31st October 2022
Date of Completion: 29th October 2024
Completion Period: 24 months from date of Appointment
Client: National Highways Authority of India (NHAI)
Concessionaire: H.G. Khammam Devarapalle Pkg-1 Private Limited
EPC Contractor: H.G.INFRA ENGINEERING LTD.
Independent Engineer: LEA Associates South Asia Pvt. Ltd
Project Model Type: Hybrid Annuity Mode (HAM)
Maintenance Period: 15 Years